American Homes RoofingSan Antonio, Texas(210) 778-8060Free inspection

Roof Replacement in San Antonio

When a repair no longer makes sense, a full re-roof. Start with a free inspection.

Call (210) 778-8060

  • Signs it may be time to replace
  • What affects the cost of a new roof
  • Financing is available
American Homes Roofing crew member on a roof being replaced, with bundles of new shingles along the ridge and a pickup and dump trailer in the driveway.

Request a call back

Your name and number are all we need. We will call you to set a time.

We use these details only to answer your inquiry. How American Homes Roofing handles your details.

Signs it may be time to replace

One of these on its own doesn't always mean a new roof. Several together usually do.

  • Leaks in more than one place, or leaks that come back after repairs
  • Widespread curling, cracking or missing shingles
  • Storm damage across large parts of the roof
  • A sagging roof line
  • An older roof that has already had many repairs

What affects the cost of a new roof

Every roof is priced on its own. These are the things that move the number, so it helps to know them before the inspection.

  • The size of the roof and how steep it is
  • The roofing material and color you choose
  • How many old layers have to come off first
  • Damaged decking found once the old roof is removed
  • Chimneys, skylights, vents and valleys that need new flashing

Inside a new roof

What goes into a new shingle roof

A new shingle roof is more than new shingles. It's built in layers, each with its own job. Here they are at the roof's lower edge, from the wooden deck up. Tap a layer to see what it does.

Roof deck

Wood panels fastened to the rafters. Every other layer is fastened to the deck, so soft or rotted panels have to be replaced before a new roof goes on.

Drip edge

A metal strip along the roof's edges. It steers water off the roof and into the gutter, instead of letting it curl back under and soak the edge of the deck and the fascia board.

Leak barrier at the eave

A self-sealing membrane along the roof's lowest edge, where water collects and debris can back it up. It seals around the nails driven through it.

Underlayment

A water-resistant sheet over the whole deck. It's a second line of defense if water gets past the shingles.

Starter strip

The first course at the edge, with a strip of adhesive along it. It fills the gaps under the first row of shingles and holds that row down against the wind.

Shingles

The layer you see. Each row overlaps the one below, so rain runs down and off. A strip of sealant bonds each shingle to the row below once the sun warms it.

Ridge cap

Shingles folded over the peak, where the two sides of the roof meet. On many roofs they cover a ridge vent that lets hot air out of the attic.

Financing is available

Ask us about current financing options for your roof project. Eligibility and terms depend on the provider and your application; request the written terms before deciding.

Financing information

How it works

  1. The inspection

    We look at the whole roof, not just the obvious damage.

  2. Your options

    We explain what we found and what a replacement involves, including your choice of materials and colors.

  3. Installation

    We schedule the work and install the new roof.

On the job

A shingle re-roof, partway through

One of our crews replacing a shingle roof in October 2026. Tap a number to see what's happening at each spot.

A shingle roof being replaced: new shingle bundles along the ridge, underlayment over the deck, a crew member on the roof, and a pickup and dump trailer in the driveway.
  1. Where two slopes meet, rain runs together and fast. Here a crew member is working on the metal that lines this valley before shingles cover it.

  2. The old shingles are off. What's showing now is the old felt underlayment, and it comes off too: synthetic underlayment goes down in its place.

  3. The trailer beside the house is for the old roofing as it comes off.

  4. Bundles of new shingles wait along the ridge, close to where the crew will lay them.

  5. Gutters carry off the water the roof sheds. The metal drip edge along the roof's edge steers that water into them.

Getting ready for the work

Replacing a roof is noisy work. A little preparation helps.

  • Move cars out of the driveway and away from the house
  • Take down pictures and mirrors on the top-floor walls; hammering can shake them
  • Cover things stored in the attic, since dust can fall from the roof deck
  • Keep children and pets indoors, away from the work area
  • Tell us about sprinklers, gates or anything else we should know
Bundles of new shingles staged on a roof during a replacement, seen past a dump trailer, with a crew member working beside the house.

Where we work

We're based in San Antonio and work across the city, including Stone Oak, and in nearby cities from Boerne and Helotes to New Braunfels, Schertz and Seguin. See every area we serve, or call and ask about your address.

Areas we serve

Google reviews

5.0 from 150 Google reviews

As of October 2026. Read what our customers wrote on our Google Business Profile.

Read our Google reviews

Ask for a free roof inspection

Tell us where the roof is and what you're seeing. We'll call you to arrange a time.

Request a free inspectionCall (210) 778-8060